Turbines

Turbines

Mainline provides highly experienced service technicians for all types of wind turbine fit-out, commissioning and maintenance services. It is essential that wind turbines are professionally serviced on a regular basis to ensure optimum performance. Correct service and maintenance are key to the life span of your turbine.

Our skilled technicians provide expert labour, whether it is turbine fit-out, commissioning, service works, operational assistance, gearbox refurbishment or replacement of spare parts.

Sample Projects

Site: Slievecallan Wind Farm (East and West), Glennageer, Co. Clare.

Work Completed: 29 x Turbines Energised following testing and commissioning. Managed HV Safety rules on site for the client to allow for the VLF testing of circuits, access into the Basement of the Turbine for Ongoing maintenance.

Site: Tullahannell Wind Farm, Tullahennell South, Co. Kerry.

Work Completed: 13 x Turbines Energised following testing and commissioning. Managed HV Safety rules on site for the client to allow for the VLF testing of circuits, access into the Basement of the Turbine for Ongoing maintenance.

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning.

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning.

G.E. Turbines – Commissioning of HV Switchgear (5 x WTG’s) –Completed June 2018

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning.

G.E. Turbines – Commissioning of HV Switchgear (12 x WTG’s) –Completed June 2018

Boolynageragh WF – Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning. (16 x WTG’s) – Complete October 2019

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning. MV Collector cable installation, jointing & testing. Earth electrode resistance measurement.

G.E. Turbines – Commissioning of HV Switchgear (4 x WTG’s) –Completed September 2017

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning. (18 x WTG’s) – Complete May 2019

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning.

Turbine MV / LV Fit out, Transformer & MV/LV cable installation, Transformer Protection/Control installation & commissioning.

Scotland, repair work on 21 x Turbines involved the replacement of 21 cables (Rotor and Stator) between the Generator and Yaw Deck. This involved replacing and relugging the cables and then carrying out both Ductor and Megger Tests on the replaced cables.

G.E. Turbines – Commissioning of HV Switchgear (21 x WTG’s) – Completed August 2018