Tullahennel Wind Farm – EBoP
Mainline completed the EBoP (Electrical Balance of Plant) works in 2019 (as part of a Joint-Venture), the scope of the 13 Wind Turbine project included:
- EBoP Substation Design and Build / Fit Out (IPP and ESBN stations)
- Wind Farm MV/HV Collector Cables (Installation/Jointing/Testing)
- Grid Connection MV/HV Cables (Installation/Jointing/Testing)
- Wind Farm Fiber (Installation/Jointing/Testing)
- Commissioning of the Turbines.