Meenadreen Wind Farm – EBoP
Mainline completed the EBoP works in 2016 (as part of a Joint-Venture), the scope of the 38 Wind Turbine project included:
- Wind Farm MV/HV Collector Cables (Installation/Jointing/Testing)
- Wind Farm Fiber (Installation/Jointing/Testing)
- Grid Connection MV/HV Cables (Installation/Jointing/Testing)
- Grid Connection Fiber (Installation/Jointing/Testing)
- Fit-out and Commissioning of the Turbines.