Meenadreen Wind Farm – EBoP

Mainline completed the EBoP works in 2016 (as part of a Joint-Venture), the scope of the 38 Wind Turbine project included:

  • Wind Farm MV/HV Collector Cables (Installation/Jointing/Testing)
  • Wind Farm Fiber (Installation/Jointing/Testing)
  • Grid Connection MV/HV Cables (Installation/Jointing/Testing)
  • Grid Connection Fiber (Installation/Jointing/Testing)
  • Fit-out and Commissioning of the Turbines.