Ballycumber Wind Farm – 6 WTG’s

Client: Ballycumber Wind Farm.

Site: Ballycumber Wind Farm, Rathshanmore South, Mullins, Co. Wicklow.

Work Completed: SAP on site for Wind Farm Energisation (6 x Wind Tubines). Works included energising the IPP Substation including the 38/20kV Grid Transformer, 20/0.4kV HoT, 20kV Substation Switchgear, VLF, insulation resistance and Partial Discharge (PD) testing of Wind Farm Radials and Grid Cable.