Mainline has installed, jointed and tested hundreds of kilometres of fibre work on numerous windfarms. We have installed significant volumes of fibre in Dublin and Cork Airports, both landside and airside. The following are some windfarm examples:
- Hastkullen Windfarm – Sweden (150km)
- Ballycumber Windfarm Grid and Collector (29km)
- Tullahennel Windfarm (15km)
- Meenadreen Windfarm (30km)
- Knocknalour Windfarm to Crory 220kV Substation (12km)
- Gortahile Windfarm to Carlow 38kV Substation (18km)
- Dromdiveen Windfarm to Glenlara 110 kV Substation (19km)
- Garrycummer Windfarm to Cauteen 110 kV Substation (17km)
- Gibbet Hill WF to Crory 220kV Substation (14km)
- Grouse Lodge Windfarm to Rathkeale 110kV Substation (6km)
- Bawnmore (1&2) Windfarm to Macroom 110kV Substation (10km)
- Boggeragh Windfarm to Glashavoon 220kV Substation (8km)
- Ballyvane Windfarm to Ballylickey 110kV Substation (25km)
- Knockwarriage Windfarm to Trien 110kV Substation (33km)
- Letterfrack Windfarm to Salthill110kV Substation (20km)
- Ballybeagh Windfarm Thurles to Blanchfield 38kV Substation (26km)
- Cordal to Scartaglin 38kV Grid Connection (12km)
- Tullanamoyle II and III 20kV Grid Connection (8km)
- Ballycumber Windfarm Kilmagig to Mangans 38kV Substation (27km)