Inniscarra
In 2023 Mainline successfully delivered the design and construction of a 5 MW solar farm in County Cork. The project included Design & Build, testing and commissioning of the ESB/ IPP substation and the Grid Connection.
In 2023 Mainline successfully delivered the design and construction of a 5 MW solar farm in County Cork. The project included Design & Build, testing and commissioning of the ESB/ IPP substation and the Grid Connection.