Yellow River Wind Farm
Yellow River is a 29-turbine wind farm located in County Offaly, near the village of Rhode. The wind farm is connected to a newly constructed 33kV substation, developed in parallel with the wind energy infrastructure.
Mainline’s scope of works was delivered in 2024 and included the design, procurement, installation, jointing, and termination of the medium-voltage (MV) collector system within the turbines.
In addition, Mainline carried out the installation and testing of the fibre optic network, foundation earthing, and the wind farm counterpoise earthing system. The project involved the installation of approximately 190,000 metres of MV cable.