Barranafaddock (Waterford)
38KV grid connection, installation and jointing of 20mm of 38 KV cable and communication fibre optic from Barranafaddock Wind Farm to Barrymore ESB 38 KV substation.
38KV grid connection, installation and jointing of 20mm of 38 KV cable and communication fibre optic from Barranafaddock Wind Farm to Barrymore ESB 38 KV substation.