LVP

Mainline completed the LVP project in 2024 at Dublin Airport. The works involved the installation of 252 new airfield runway lights, relabelling of 92 existing lights, 48 km of primary cabling, and the installation of pit furniture.

The project also included the installation of several new and repurposed Constant Current Regulators (CCRs) in the substations serving Runway 16/34. These activities were carried out across multiple shifts, primarily at night, in a challenging and time-sensitive environment. The project required substantial documentation and compliance with ITP protocols through the DAA’s ACC portal, along with a large volume of as-built drawings. All works were completed on time and to a high standard of quality.