Tullanamoyle Wind Farm II & III – Grid Connection

Mainline completed the Grid Connection works in 2018, the scope included:

  • The Design, Supply, Installation, Testing and Commissioning of the 20kV Grid connection including cabling, jointing, trenching, ducting and chambers.
  • All associated ROL & Traffic Management requirements.
  • The Gird Route was 20km in length (dual circuit – each 10km in length) and comprised of 8 double Joint Bays in total, with 4 (set of 6) Straight Through Joints & 4 Sheath (set of 6) Break Joints, terminations at 2 (set of 3) at the Wind Farm Substations and ESBN (Corderry Substation).