Crossmore Windfarm EBoP

In Q4 2023 Mainline commence work on the 7 Turbine Wind Farm in Co Clare for Energia.

The scope of work consists of the design and build of the 38kV Substation, Collector cable to the 7 turbines, and 13km grid connection (6km of Overhead Line and 7km of Under Ground Cable) to the Booltiagh Substation. The project duration is approximately 18 months.